As part of the dirt work, the lean-to on the barn was removed. The structure didn’t appear to be original and needed lots of repair – it also didn’t need much coaxing to come down. John was out at the farm on a daily basis to monitor the process. He also took the opportunity to trench power from the pole to the barn. Since then, he has created a master electrical plan with friend Tom Manternach of (Electrical Concepts)
No comments:
Post a Comment